Scheduling of construction production in the construction of buildings with volume-modular blocks


Views: 61 / PDF downloads: 49

Authors

  • Azhar Baimurzina Eurasian National University named after L.N. Gumileva
  • Atogali Jumabayev Eurasian National University named after L.N. Gumileva

DOI:

https://doi.org/10.32523/2220-685X-2022-67-4-42

Keywords:

calendar plan, space-modular blocks, above-ground part, subcontracting, cyclogram, glazing

Abstract

The article provides an algorithm for constructing a schedule with a minimum duration of the project. There are four types of dependencies between jobs in combined execution: "start-finish", "start-start", "finish-finish" and "finish-start". The article considers the finish-start dependencies as the most common ones. The advantages of using the nodal method are also given, which allows you to focus the attention of all participants on the most important stages of construction, which makes it possible to significantly reduce the construction time of the enterprise, including the time for commissioning.

Published

2023-01-23

How to Cite

Baimurzina А. ., & Jumabayev А. . (2023). Scheduling of construction production in the construction of buildings with volume-modular blocks. Рroblems of Engineering and Professional Education, 67(4), 42. https://doi.org/10.32523/2220-685X-2022-67-4-42

Issue

Section

Статьи