On the issue of reducing non-production losses working hours in construction


Views: 46 / PDF downloads: 42

Authors

  • Boris 5 / 5 000 Результаты перевода Перевод Boris Gordienko Eurasian National University named after L. N. Gumilyov
  • Jantore Shyntemirov Eurasian National University named after L. N. Gumilyov

DOI:

https://doi.org/10.32523/2220-685X-2016-35-2-41-46

Keywords:

: engineering technician, correlation, regression equation, variance analysis, correlation matrix, mathematical apparatus

Abstract

One of the significant problems in producing is a loss of working time on the construction
site. The topic is relevant, because it bears for a big impact, both in economic terms, and there is long
delay, which is not good

Published

2023-02-27

How to Cite

Gordienko Б., & Shyntemirov Ж. (2023). On the issue of reducing non-production losses working hours in construction. Рroblems of Engineering and Professional Education, 35(2), 41–46. https://doi.org/10.32523/2220-685X-2016-35-2-41-46

Issue

Section

Статьи